OFFICE / COMMERCIAL

coming soon !

Additional Project

 

CANYON POINTE OFFICE BUILDING - Spokane, Washington – A&A Construction & Development
Structural design and preparation of AutoCad construction drawings of a 4-story, 42,000 sf steel office facility. Project consisted of: Vulcraft joists and girders for the floor and roof structures; braced frames and concrete shearwalls for the lateral force resisting system.


LIBERTY LAKE OFFICE BUILDING – Liberty Lake, Washington – A&A Construction & Development
Structural design and preparation of AutoCad construction drawings of a 4-story, 44,000 sf steel office facility. Project consisted of: Vulcraft joists and girders for the floor and roof structures; braced frames and concrete shearwalls for the lateral force resisting system.


FARM CREDIT SERVICES - Spokane, Washington - Arger Capital
Structural design and preparation of AutoCad construction drawings of a 4-story, 67,000 sf steel office facility. Project consisted of: Vulcraft joists and girders for the floor and roof structures; braced frames and concrete shearwalls for the lateral force resisting system.


COLUMBIA WEST OFFICE BUILDING – Bellevue, Washington – Sconzo Hallstrom Architects

Structural design and preparation of AutoCad construction drawings of a 2-story, 50,000 sf concrete office facility. Project consisted of: 16,000 sf of precast tilt-up concrete wall panels; Vulcraft joists and girders for second floor and roof structure; concrete shearwalls for lateral force resisting system.