RETAIL

coming soon !

Additional Project

 

MOUNTAIN WEST BANK – Spokane, Washington Baker Construction & Development
Civil and Structural design and preparation of AutoCad construction drawings of a 2-story, 14,000 sf steel financial institution. Project consisted of: Structural steel framework; open-web steel joists and girders for the floor and roof structures; Steel moment frames for the lateral force resisting system.


WALGREENS – Post Falls, Idaho Sconzo Hallstrom Architects
Structural design and preparation of AutoCad construction drawings of a one-story, 32,000 sf concrete office facility. Project consisted of: 13,000 sf of precast tilt-up concrete wall panels; Vulcraft joists and girders for second floor and roof structure; concrete shearwalls for the lateral force resisting system.


GOLD’S GYM – Spokane, Washington – Wolff Planning Group
Civil and Structural design and preparation of AutoCad construction drawings of a 23,000 sf athletic facility. Project consisted of: Vulcraft joists and girders for the floor and roof structures; braced frames and masonry shearwalls for the lateral force resisting system.


DIAMOND SHOPPING CENTER – Spokane WA Harlan D. Douglass
Civil and Structural design and preparation of AutoCad construction drawings of a 125,000 sf retail center. Project consisted of: CMU wall panels; Vulcraft joists and girders for the roof structure; CMU shearwalls for the lateral force resisting system.